Supply Of One Coach Set Of Underframe Details (cross Member Assy, Stiffeners Etc) For Train Set Mc,ndtc And Tc Coaches T...
Procurement Summary
Location
Organisation Name
Deadline
Multi city, Multi State, India
INTEGRAL COACH FACTORY
19th May, 2026
Purchaser's Detail
Supply Of One Coach Set Of Underframe Details (cross Member Assy, Stiffeners Etc) For Train Set Mc,ndtc And Tc Coaches To Drg Nos. 1) 72711024, Alt. "b" - 2 Nos, 2) 72711025, Alt. "b" - 2 Nos, 3) 72711026, Alt 'c '- 2 Nos, 4) 72711027, Alt 'c' - 2 Nos, 5) 72711028 - 2 Nos, 6) 72711029 - 2 Nos, 7) 72711015, Alt 'a'- 12 Nos, 8) 72711016, Alt 'a'- 12 Nos, 9) 72711030 - 2 Nos, 10) 72711031 - 2 Nos, 11) 72711033, Alt 'a' - 2 Nos. 12) 72711034, Alt 'a' - 2 Nos. 13) 72711037 - 2 Nos, 14) 72711038 - 2 Nos, 15) 72711039, Alt 'a' - 2 Nos, 16) 72711040, Alt 'a' - 2 Nos, 17) 72711041, Alt 'a' - 2 Nos, 18) 72711042 - 2 Nos, 19) 72711077 - 4 Nos, 20) 72711078 - 4 Nos, 21) Aae11764 - 4 Nos, 22) Aae11192 - 4 Nos, 23) Aae11102 - 2 Nos, 24) Aad11946 - 4 Nos, 25) Aad11945 - 4 Nos, 26) Aad11944, Alt-'a' 4 Nos, 27) Aad11955, Alt 'a' - 2 Nos, 28) Aad11526, Alt 'b' - 20 Nos, 29) 72711035, Alt 'a' - 2 Nos, 30) 72711036, Alt 'a' - 2 Nos, 31) Aad11701 Alt 'b' - 2 Nos, 32) Aae11101 Alt 'a' - 4 Nos, 33) Aad11951, Alt-'b' - 2 Nos, 34) Aad11950, Alt-'b' - 2 Nos, 35) Aad11964 - 4 Nos, Special Condition : Finished Components Except Ss Components Shall Be Thoroughly Cleaned And Latest To A Dft Of Minimum 60 Microns And Mdts-094, Rev-01 With Amnd-01 Or (latest) Shall Be Applied With Epoxy Zinc Phosphate Primer As Per Rdso/spec No.m&c/pcn/100 Followed. For Procedure And Colour Shade Excluding The Areas As Specified In Detail Drawings. All The Items Are To Be Supplied As Coach Set Only. Suitable Packing To Be Done To Prevent Damage During Transit, Unloading And Rust Prevention During Storage. Stage Inspection Details. (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (c) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Final Product Inspection. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]
Other Information
Notice Type
RefID
Last Date Of Submission
Opening Date
tender
45242103
19th May, 2026
Refer To Document
Cost
Document Cost
EMD
Estimated Cost
Refer Documents
Refer Documents
Refer Documents