Supply, Testing And Commissioning (including All Connections And Dressing W/o Loading) Of Switch Board Cabinet, As Per D...
Procurement Summary

Location

Organisation Name

Deadline

Kapurthala, Punjab, India

Rail Coach Factory

17th Nov, 2026

Purchaser's Detail

Supply, Testing And Commissioning (including All Connections And Dressing W/o Loading) Of Switch Board Cabinet, As Per Drawing: Edts134,rev-d,am-5,cor.-2,rcf Annex. A & C, Packing Instruction: Electrical Panels To Be Protected With Transparent Biodegradable Polythene Bag/sheets Thickness Of 0.1 Mm Or An Antistatic Bag Of 350 To 400 Gauge (100 Micron Approx.) On All Sides Of Panel &panel Shall Be Packed In Transport Worthy Wooden Cage. Bottom Frame To Be Made Of Wooden Planks 20mm Thick &should Have Support Of At Least 3 Wooden Batons Of Size 100x100mm Of Suitable Length To Facilitate Lifting By Fork Lifter &secure Properly With Suitable Packing To Avoid In-transit Damage. Each Panel To Be Packed In Transport Worthy Wooden Cage Of Suitable Dimensions Made Out Of Wooden Strip Of 20x100 Mm Size. Gap Between Each Strips Should Not Be More Then 100mm.a List Should Be Pasted On Each Wooden Cage Showing Order No, Pl No, Description, Drg /spec. No, Qty, Firm'name &address, Consignee Name, Date Of Dispatch, Top Bottom Arrow Mark Etc. Note- 1) Firms Have Option To Provide Qr Code. For Linkage Of Po, The Cardboard Box Shall Carry A Qr Code Having Details As Listed Below: A)name Of The Manufacturer B)purchase Order Number C)purchase Order Date D)unique Serial Number (or Lot Number For Bulk Items) Of The Manufacturer or E)date Of Manufacture F)delivery Challan No. G)delivery Challan Date 2. The Qr Code Shall Be As Per Iso/iec 18004 Model2 And The Data Shall Be Available As Xml Using The Tagsdetailed Above. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] ]

Other Information

Notice Type

RefID

Last Date Of Submission

Opening Date

tender

47268820

17th Nov, 2026

Refer To Document

Cost

Document Cost

EMD

Estimated Cost

Refer Documents

Refer Documents

Refer Documents

Download Documents

Want to bid in this tender

Get local Agent Support on This tender

Get Free Consultation

Get your quote now and avail the chance to enter first 5 lucky customer with extra 20% discount